INTERNATIONAL AIRPORT

May 23, 2019

 INTERNATIONAL  AIRPORT. The much-awaited Bicol International Airport (BIA) is now 57.44% complete. This, after the site inspection of the airport’s construction led by Department of Transportation (DOTr) Secretary Arthur Tugade was conducted last month where the airside of the airport comprising the airstrip, runway, taxiway, apron and perimeter fence is reportedly already 100% complete, while the landside comprising of all the buildings and site development are currently in the works, according to a Facebook post by DOTr.   DOTr PHOTO

Share on Facebook
Share on Twitter
Please reload